Golar LNG LtdShs Aktie
WKN: 677102 / ISIN: BMG9456A1009
17.03.2020 18:05:20
|
Golar Power completes 96 hour reliability test at 1.5GW Sergipe Power Plant
Golar Power Limited ("Golar Power”) has successfully completed today the final operational test at the 1.5GW Sergipe Power Plant.
The test involves supplying the maximum load of the plant (1.5 GW) to the National Interconnected System (SIN) for a period of 96 continuous hours. The test is the final requirement of the National System Operator (ONS) in order to start commercial operations under the 25-year power purchase agreements.
For the test, the three gas turbines, the steam turbine and three heat recovery boilers operated in a combined cycle and delivered a volume in excess of 1.5GW, for 96 continuous hours. The test was successfully completed this morning at 03:00am (GMT).
Hamilton, Bermuda
March 17, 2020
Enquiries:
Golar Management Limited: + 44 207 063 7900
Eduardo Maranhao
Stuart Buchanan

Wenn Sie mehr über das Thema Aktien erfahren wollen, finden Sie in unserem Ratgeber viele interessante Artikel dazu!
Jetzt informieren!
Nachrichten zu Golar LNG LtdShsmehr Nachrichten
26.02.25 |
Ausblick: Golar LNG verkündet Quartalsergebnis zum jüngsten Jahresviertel (finanzen.net) | |
12.02.25 |
Erste Schätzungen: Golar LNG gewährt Anlegern Blick in die Bücher (finanzen.net) | |
11.11.24 |
Ausblick: Golar LNG stellt Zahlen zum jüngsten Quartal vor (finanzen.net) | |
28.10.24 |
Erste Schätzungen: Golar LNG legt Quartalsergebnis vor (finanzen.net) |
Analysen zu Golar LNG LtdShsmehr Analysen
Aktien in diesem Artikel
Golar LNG LtdShs | 35,11 | -0,06% |
|