26.06.2008 18:45:00
|
Parallel Petroleum Announces Acquisition of Additional Interests in Diamond M Project and Related Conference Call and Webcast
Parallel Petroleum Corporation (NASDAQ: PLLL) today announced that it
exercised its preferential right and purchased the interests owned by
Southwestern Energy Company (NYSE: SWN) in Parallel’s
operated Diamond M properties in Scurry County, Texas, effective May 1,
2008. The purchase price of approximately $35.5 million was financed
with borrowings under the Company’s revolving
credit facility. The additional interests acquired represent current
daily production of approximately 298 net barrels of oil equivalent
(BOE), and proved reserves of approximately 3.5 million BOE, of which
46% is proved developed producing (PDP) reserves. Please refer to the
Table 1 below for important information relating to the proved reserves
acquired by Parallel in this transaction.
The acquired interests consist of two components, including an 89%
working interest in the Base production and reserves and a 22.3% working
interest in the production and reserves above the Base. As used in
Parallel’s original trade agreement with
Southwestern Energy, the "Base”
production and reserves generally refers to and means future production
and reserves defined by an established base production decline curve as
of December 19, 2001. Prior to this acquisition, Parallel did not own an
interest in the Base production and reserves but owned a 65.7% working
interest in the production and reserves above the Base. This acquisition
resulted in an increase in the Company’s
current ownership in the Base production and reserves from zero to an
approximate 89% working interest (77% net revenue interest), and an
increase in the production and reserves above the Base from a 65.7%
working interest to an 88% working interest (76% net revenue interest).
Diamond M Property Information
Parallel first became involved in its Diamond M project in December 2001
and took over field operations in early 2003. The project consists of
the Lion Diamond M (Canyon Reef) Unit, which produces from intervals
between 6,500 and 7,000 feet, and the Diamond M (Glorieta, Clearfork and
Wichita Albany or "GCW”)
shallow leases, which produce from intervals between 2,600 to 4,000
feet. The Diamond M assets are located on the Pennsylvanian age
Horseshoe Atoll of Scurry County, Texas, between the SACROC and Sharon
Ridge Canyon Reef units. Based on publicly available data, these two
offset units have produced approximately 1.3 billion and 200 million
barrels of oil, respectively, and are currently producing more than
23,000 and 1,200 barrels of oil per day, respectively.
Based on comparisons of the production and recovery characteristics
between the 5,800-acre Lion Diamond M (Canyon Reef) Unit and the offset
SACROC and Sharon Ridge units, Parallel believes recoverable oil
reserves remain in its Canyon Reef Unit. To date, Parallel’s
redevelopment of the Canyon Reef has included well reactivations,
recompletions, a modest amount of infill drilling, and the acquisition
of a new 3-D seismic survey. Future activity will include waterflood
reimplementation, the continuation of recompletions, reactivations, well
deepenings, infill drilling, and ultimately CO2 injection. Infill
drilling, waterflood expansion and workover opportunities also exist on
the Diamond M "GCW”
shallow leases, which lie inside the confines of the Lion Diamond M
(Canyon Reef) Unit.
Average daily production for Parallel’s
Diamond M project, including the Canyon Reef and shallow leases
combined, was approximately 662 gross (503 net) BOE per day during the
month of May 2008. On June 24, 2008, the project was producing at a
combined daily rate of approximately 845 gross (640 net) BOE per day.
The Company’s 2008 plans for the Canyon Reef
project include the drilling and completion of approximately 12 gross
(10.6 net) new wells and the workover or deepening of approximately 18
gross (15.8 net) existing wells. The Company has drilled 6 of the 12
wells and has recently completed 4 of the wells, which are now on
production at a combined current rate of approximately 290 gross (220
net) BOE per day. The fourth well was placed on production on June 25,
2008.
Proved Reserves Information
The table below shows important information relating to the proved
reserves acquired by Parallel in this transaction.
TABLE 1 PARALLEL PETROLEUM CORPORATION PROVED RESERVES ACQUIRED IN DIAMOND M PROJECT (1) As of May 1, 2008 (unaudited) Total Proved Reserves:
Oil (MMBbl)
3.2
Natural gas (Bcfg)
1.7
Barrels of oil equivalent (MMBOE)
3.5
SEC Reserve Categories:
PDP (MMBOE) (2)
1.6
PDNP (MMBOE) (3)
0.1
PUD (MMBOE) (4)
1.8
Total Proved Reserves (MMBOE)
3.5
(1) Based on independent reserve studies
prepared by Cawley, Gillespie & Associates, Inc., the Company's
independent petroleum engineers.
(2) PDP is proved developed producing
reserves.
(3) PDNP is proved developed non-producing
reserves.
(4) PUD is proved undeveloped reserves.
Management Comments
Larry Oldham, Parallel’s President and CEO
commented, "We believe this acquisition
significantly enhances our existing opportunities for continuing and
accelerating development in our Diamond M project. This acquisition
illustrates the basic tenets of our "acquire
and exploit” strategy: a focus on quality
assets that are significant in size and opportunity; that are
synergistic to existing operations; and that are, or will be, controlled
by Parallel.”
In a final comment, Oldham stated, "In
December 2007, we sold common stock for net proceeds of approximately
$52.5 million. As we announced at the time of the equity offering, we
used the net proceeds to repay borrowings under our revolving credit
facility and anticipated that the net proceeds would be available under
our revolving credit facility as needed in the future to finance our
exploitation, development and acquisition activities. We are pleased to
announce that this $35.5 million acquisition was easily funded through
our revolving credit facility.” Conference Call and Webcast Information
Parallel’s management will host a conference
call to discuss the Diamond M project on Friday, June 27, 2008, at 10:00
a.m. Eastern time (9:00 a.m. Central time). To participate in the call,
dial 888-713-4211 or 617-213-4864, Participant Passcode 82491793, at
least ten minutes before the scheduled start time. The conference call
will also be webcast with slides, and can be accessed live at Parallel’s
web site, http://www.plll.com. A
replay of the conference call will be available at the Company’s
web site or by calling 888-286-8010 or 617-801-6888, Passcode 12392947.
Participants may pre-register for the call at Parallel’s
web site on the Event Details page for the webcast or at www.theconferencingservice.com/prereg/key.process?key=PRKURH4XA.
Pre-registrants will be issued a pin number to use when dialing into the
live call which will provide quick access to the conference by bypassing
the operator upon connection.
The Company
Parallel Petroleum is an independent energy company headquartered in
Midland, Texas, engaged in the exploitation, development, acquisition
and production of oil and gas using 3-D seismic technology and advanced
drilling, completion and recovery techniques. Parallel’s
primary areas of operation are the Permian Basin of West Texas and New
Mexico, North Texas Barnett Shale, Onshore Gulf Coast of South Texas,
East Texas and Utah/Colorado. Additional information on Parallel is
available via the internet at www.plll.com.
This release contains forward-looking statements subject to
various risks and uncertainties that could cause the Company’s
future plans, objectives and performance to differ materially from those
in the forward-looking statements. Forward-looking
statements can be identified by the use of forward-looking terminology
such as "initial daily test rates,” "may,” "will,” "expect,” "intend,” "plan,” "subject
to,” "anticipate,” "estimate,” "continue,” "present value,” "future,” "reserves”, "appears,” "prospective,” or
other variations thereof or comparable terminology. Factors that could
cause or contribute to such differences could include, but are not
limited to, those relating to: the results of exploratory drilling activity; the Company’s growth strategy; changes in oil and natural gas prices; operating risks, availability of drilling equipment; outstanding indebtedness; weaknesses in our internal controls; the inherent variability in early production tests; uncertainties inherent in estimating production rates; the availability and capacity of natural gas gathering and
transportation facilities; the period of time that our oil and natural gas wells have been
producing; changes in interest rates; dependence on weather conditions; seasonality; expansion and other activities of competitors; changes in federal or state environmental laws and the
administration of such laws; and the general condition of the economy and its effect on the
securities market. While we believe our forward-looking statements are based upon
reasonable assumptions, these are factors that are difficult to predict
and that are influenced by economic and other conditions beyond our
control. Investors are directed to consider such risks and
other uncertainties discussed in documents filed by the Company with the
Securities and Exchange Commission.
Der finanzen.at Ratgeber für Aktien!
Wenn Sie mehr über das Thema Aktien erfahren wollen, finden Sie in unserem Ratgeber viele interessante Artikel dazu!
Jetzt informieren!
Wenn Sie mehr über das Thema Aktien erfahren wollen, finden Sie in unserem Ratgeber viele interessante Artikel dazu!
Jetzt informieren!
JETZT DEVISEN-CFDS MIT BIS ZU HEBEL 30 HANDELN
Handeln Sie Devisen-CFDs mit kleinen Spreads. Mit nur 100 € können Sie mit der Wirkung von 3.000 Euro Kapital handeln.
82% der Kleinanlegerkonten verlieren Geld beim CFD-Handel mit diesem Anbieter. Sie sollten überlegen, ob Sie es sich leisten können, das hohe Risiko einzugehen, Ihr Geld zu verlieren.
Nachrichten zu Parallel Petroleum Corp.mehr Nachrichten
Keine Nachrichten verfügbar. |